Wednesday 31 December 2008
Roof assembly
I have begun to explore the assembly of the roof. This will consist of three elements; two small side gutter roofs either side of the horizontally spanning louvres across the 2m width along the entire length of the click-raft roof. This will enable a fully openable roof-skin, which will be operated by lego mindstorms robots with light, and temperature sensors.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment