Wednesday, 31 December 2008

construction update - outer skin















Time to update the blog at the end of 2008. Many small details have been further developed and refined.
Included amongst these was to finally choose to go for an asymetric mono-pitch roof structure which required taking off all of the roof beams again and re-cutting the click-joints to achieve this. (see construction photos)
The other work being carried out over the last period has been the realisation of the outer skin.
In the end I decided to realise both long side walls in 2500 x 1250 x 10mm vertically assembled polycarbonate panels rather than horizontal louvres.
See the sequence of shots showing their assembly - took a bit of fiddling around to get the right technique going, but with the help of a cake of soap my time per panel came down to 20 mins/panel (incl cutting and assembling joining pieces, the panels and the 200mm stainless steel rod fixings). In the long term with different kinds of fixings this technique could be radically refined and streamlined. For now this is a cheap and straight forward to achieve closure of the entire outer envelope.